Indoor LED wall
- Load: 1,800 W
- Supply: 300 W
- Headroom: 20%
Design load is 2,160 W. At 240 W usable per supply, plan 9 supplies.
Derating often adds more supplies than a nameplate-only calculation. Always verify with the actual power supply datasheet.
Estimate how many LED power supplies are needed after derating and project headroom are applied.
Electrical safety disclaimer: This calculator estimates power supply count for early planning only. Breaker sizing, wire gauge, grounding, conduit, thermal design, waterproofing, and code compliance must be handled by qualified electrical engineers. Incorrect electrical design can create fire, shock, and equipment damage risks.
Design load = total LED load x (1 + headroom percent)
Usable supply watts = supply rating x derating factor (80%)
Supply count = ceil(design load / usable supply watts)Design load is 2,160 W. At 240 W usable per supply, plan 9 supplies.
Derating often adds more supplies than a nameplate-only calculation. Always verify with the actual power supply datasheet.
Design load is 5,625 W. At 320 W usable per supply, plan 18 supplies.
Outdoor thermal conditions usually justify conservative headroom. Consider three-phase distribution for loads above 3-4 kW.
Design load is 2,880 W. At 160 W usable per supply, plan 18 supplies.
Critical installations may add N+1 redundancy on top of this count. Discuss redundancy requirements with the project engineer.
Running power supplies at 100% output continuously reduces lifespan and increases failure risk. Always apply manufacturer-recommended derating for continuous loads.
LED displays often exceed average power during bright content. Without headroom, power supplies may shut down or trip protection circuits during peak scenes.
High ambient temperature, altitude, and enclosed installations reduce power supply capacity. Outdoor and enclosed setups need additional thermal margin.
Different power supply models may have different output curves, start-up behavior, and protection thresholds. Mixing models in one installation should be validated by the engineer.
Power supply configured? Next, estimate energy consumption and running cost.